Use and maintenance of riveting machine

1, do not process more than the nominal ability of the workpiece.

2. Don't work long hours under high pressure.

3. The extension length of the rivet should not exceed the specified value.

4. Stop for maintenance immediately in case of any abnormality, and troubleshoot directly.

5. Grease the guide rail of the equipment once a month for lubrication and rust prevention.

6, riveter installation and disassembly to be slow, especially in the removal of riveter do not use brute force to pull out, should rotate the riveter and slowly pull down.If the rivet seat of the inserted rivet is pulled out of the normal position, there will be obvious deviation in the rivet position after the rivet is installed. At this point, the red safety cover should be removed, and the rivet seat can only be used after it is installed in place, otherwise the machine is easy to be damaged.

7, the use of the rivet in the processing of some materials will appear a slight bonding phenomenon, in order to ensure the quality of rivet, it should be fixed to clean the rivet, to prevent metal bonding thickening.When cleaning, fix the rivet on the chuck of the lathe and then polish with sandpaper.

8. Daily maintenance should be carried out every two weeks. The main maintenance items are as follows.

A. Check whether there is enough lubricating oil in the pneumatic triplet oil cup, otherwise fill the oil cup with oil.

B. Check whether the steam pipes and joints are firmly connected and whether there is leakage.

C. Check whether there is any bonding phenomenon in the riveting head cavity. If there is, it should be cleaned.

D. fill the spherical pair with grease.

9. The equipment shall be stopped for maintenance in batches every 6 months, mainly for the inspection of the following items. If problems are found, the equipment shall be repaired in time.

A. Check whether there is air leakage in the upper and lower parts of the cylinder; otherwise, replace the sealing ring.

B. Check whether the steam pipes and joints are firmly connected and whether there is leakage.

C. Check whether the protruding length of the riveting head exceeds the limit, otherwise it shall be replaced.

D. Check whether the swing of the riveting head is normal or not, or stop the machine for maintenance. If it is the problem of the spherical pair, replace or repair the spherical pair in time.

E. Check whether the noise and riveting quality of the spindle are abnormal during rotation. If so, check.

F. Grease the spherical pair.

G, guide rail and other parts should be coated with butter, so as to lubricate and prevent rust.

10, maintenance should be arranged to regularly responsible for the problem, such as can not solve the problem, should promptly contact the manufacturer.

Zaozhuang make machinery co., LTD produces a variety of riveting machine, strong function, can meet a variety of customer needs, xm-12, xm-20 and other models, welcome to buy!

Copyright © زاوزهوانغ ماكينات التصنيع المحدودة ملكية الحقوق | خريطة الموقع |مدعوم من: REANOD

  • wechat

    +86 189 0632 5332: +86 189 0632 5332

  • wechat

    +86 178 6086 6228: +86 178 6086 6228

دردش معنا